Rezultaty
Project Handbook according to call requirement
Exploitation Plan: first draftExploitation Plan: first draft. report delivered according to call requirements
Selected reduced/skeletal reaction mechanism of H2/CH4 syngas combustionSelected reduced/skeletal reaction mechanism of H2/CH4 syngas combustion. this activity is prleiminary to combustionb model definitoon and burner design.Skeletal reaction mechanisms for CFD simulations will be identified based on detailed reaction mechanisms to predict the combustion process. For modelling turbulent flames, the mixing time scale (e.g. conventional flame vs. flameless conditions) for the fuel and oxidant is a crucial factor and can affect the results significantly in terms of flame structure, ignition delay, blow-off, temperature etc
Report containing the Key Performance IndicatorsRINA-CSM will provide to the Consortium, and in particular to the WP leaders, guidelines and instructions to ensure the high-quality of the results, the deliverables and the whole project. Key performance indicators (KPI) document, established at the KoM to evaluate the project results, will be revised on a 6-months basis and will be used to assess the achievements of the project. this report describe the individuated KPi and first applicationl
D1.1 Operating conditions of the reference industrial furnace 1 SWERIM R PUB 6In this Deliverable the technical characterirstic of the furnaces involved in the activitikes are described, outling similarities and differences
Communication and Dissemination Plans; mid-term analysisCommunication and Dissemination Plans; mid-term analysis. report defined according to call requirements
Communication and Dissemination Plans; first draftCreation of Website and social media channels to disseminate project results and provide update info about project activites
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników