Livrables
Output of T15
Updated version of D88
Dissemination and Communication planThis deliverable is a partial output of T81 It will be delivered in M6 and updated every 6 months
Communication kit v1As required as a minimum a narrative text photographs slides possibly complemented by a video and any other suitable communication material accompanied with copyright licences for the European Commission and for Photonics21 Output of T81
Output of T5.1, T5.2, T5.3, T5.4. This deliverables will be Public, but may include confidential Annexes, since itmay include IPR sensitive information.
Publications
Auteurs:
Christia Eleftheriou, Mahmoud Elrabiaay, George Tsekenis, Antonio Varriale, Alessandro Capo, Stephan Suckow, Bartos Chmielak, Athanasios Manolis, Dimitris Tsiokos
Publié dans:
2023
Éditeur:
31st World Congress on Biosensors, Busan South Korea, 5-8 June 2023
Auteurs:
Omkar Bhalerao, Stephan Suckow, E. Chatzianagnostou, Konstantinos Fotiadis, J.-C. Weeber, Pratyusha Das, Thanasis Manolis, Max C. Lemme
Publié dans:
2022
Éditeur:
APC
Auteurs:
Alessandro Giusti
Publié dans:
Numéro 5, 2022
Éditeur:
LOPEC
DOI:
10.5281/zenodo.6962396
Auteurs:
Evangelia Chatzianagnostou; Athanasios Manolis; Amalia Miliou; Dimitris Tsiokos; Nikos Pleros
Publié dans:
Journal of Lightwave Technology, 2021, ISSN 1558-2213
Éditeur:
IEEE
DOI:
10.1109/jlt.2021.3083365
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible