Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary

Advanced Light materials for sustainable Electrical Vehicles by Integration of eco-design and circular economy Strategies

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Dissemination and Communication Plan

Preliminary Dissemination and Communication Plan to be followed along the project duration This deliverable refers to task 71

Eco-design guidelines and results

The report will present the developed methodology and the scoring results of the LEVIS demonstrators illustrated in Radar charts This deliverable refers to task 12

LEVIS Implementation Quality Guidelines

The LEVIS Implementation Quality Guidelines will show how quality aspects are taken into account in all processes and activities within the LEVIS project as the interrelated quality processes planning assurance and control will have impact on the project work from its start to its end It will include aspects such as Quality Planning that refers to quality policies like meeting deliverable or publication policies Quality Assurance that involves the establishment of Interim Management Reports clear responsibilities and regular clearly guided telephone conferences and a welldefined internal review process further supports the Quality Assurance of deliverables and Quality Control that focuses on feedback through internal review process

Impact on EV motor efficiency

This deliverable will analyse and assess the impact of the LEVIS developments on motor efficiency. This deliverable refers to task 6.4

LCA Results of LEVIS Demonstrators

A LCA report will be produced for each demonstrator addressing the environmental impact assessment and interpretation of LCA results against the benchmark scenarios. This deliverable refers to task 6.1

Initial LCA Results of LEVIS Demonstrators

A LCA report will be produced for each demonstrator addressing the environmental impact assessment and interpretation of LCA results against the benchmark scenarios This deliverable refers to task 61

Final Technology Watch Report

Results on the technology watch performed in Task 7.4 will be gathered by SEZ in a public report. This deliverable refers to task 7.4

LEVIS Management Handbook

The Project Management will describe internal technical and administrative management procedures of the LEVIS project consortium in terms of project execution administrative management management structures communication and collaboration

Technology Watch Report

Results on the technology watch performed in Task 74 will be gathered by SEZ in a public report This deliverable refers to task 74

Replicability Study Results

A replicability study on alternative applications for the materials used in the LEVIS modules. This deliverable refers to task 6.3

Public website

Public website will be available for launch in M6 This deliverable refers to task 72

Final Data Management Plan

This report will include all data management issues related to the project implementation. It will be submitted initially in M6 and reviewed at the end of the project. This deliverable refers to task 7.6

Initial Data Management Plan

This report will include all data management issues related to the project implementation It will be submitted initially in M6 and reviewed at the end of the project This deliverable refers to task 76

Publications

Metal-composite hybrid joint adhesion and testing optimization for electric vehicle applications

Author(s): Blanca Maria Lekube, Jon Haitz Badiola, Pablo Larreategi, Felix Ares, Agustín Chiminelli, Clara Valero, Tevfik Ozgur
Published in: The Journal of Adhesion, 2023, Page(s) 1-24, ISSN 0021-8464
Publisher: Taylor & Francis
DOI: 10.1080/00218464.2023.2296658

D6.4 Replication study of LEVIS technologies

Author(s): Teunissen Floris, van Bergen Esther, Decelis Pablo
Published in: 2024
Publisher: LEVIS Project / Cenex NL
DOI: 10.5281/zenodo.13373543

D6.1 Initial LCA Results of LEVIS Demonstrators

Author(s): van Bergen Esther, Teunissen Floris
Published in: 2022
Publisher: LEVIS Project / Cenex NL
DOI: 10.5281/zenodo.13373514

D7.1 Dissemination and Communication Plan

Author(s): SEZ
Published in: 2022
Publisher: LEVIS Project / SEZ
DOI: 10.5281/zenodo.13827909

D1.3 Eco-Design guideline and demonstrator results

Author(s): van Bergen Esther, Teunissen Floris
Published in: 2022
Publisher: LEVIS Project / Cenex NL
DOI: 10.5281/zenodo.13373517

D8.3 LEVIS Implementation Quality Guidelines

Author(s): ITA
Published in: 2021
Publisher: LEVIS Project / ITA
DOI: 10.5281/zenodo.13827977

D8.2 LEVIS Management Handbook

Author(s): ITA
Published in: 2021
Publisher: LEVIS Project / ITA
DOI: 10.5281/zenodo.13828210

D7.6 Final Technology Watch Report

Author(s): SEZ
Published in: 2024
Publisher: LEVIS Project / SEZ
DOI: 10.5281/zenodo.13828094

D6.2 LCA Results of LEVIS Demonstrators

Author(s): Teunissen Floris, van Bergen Esther, Decelis Pablo
Published in: 2024
Publisher: LEVIS Project / Cenex NL
DOI: 10.5281/zenodo.13828018

D7.5 Technology Watch Report

Author(s): SEZ
Published in: 2023
Publisher: LEVIS Project / SEZ
DOI: 10.5281/zenodo.13828240

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available