Cel
The Cherenkov Telescope Array CTA will be the first open facility for gamma-ray astronomy in the
very-high-energy domain, with a performance which is dramatically improved over existing instruments in terms of sensitivity, energy coverage, survey capability and flexibility. CTA will probe non-thermal phenomena in the Universe – known to have comparable energy content to other forms of energy such as thermal radiation – both in our own Galaxy and at cosmological distances, addressing questions in astrophysics, astroparticle physics, particle physics, plasma physics, cosmology, and fundamental physics.
The CTA preparatory phase – CTA-PP – will address a number of crucial prerequisites for the approval, construction and operation of CTA:
> the set-up of a Project Office offering means for electronic communication as well as data storage and handling for documents of the whole consortium
> the legal framework, governance schemes, and financial regulations for the following phases of CTA (pre-construction, construction and operation)
> assuring funding for the pre-construction phase after termination of CTA-PP
> the preparation of funding agreements between potential funding agencies
> the preparation of negotiations with potential host countries for the CTA instrument
> the detailed technical design and costing of the CTA observatory
> the selection of sites for deployment negotiations, and detailing and cost-estimation of the required site infrastructure
> the schemes for procurement and industry involvement in the technical design and construction of CTA
> the required linking with relevant science communities regarding the detailed definition of the science program, the corresponding final optimisation of the observatory layout, and the definition of user services and data access.
For CTA-PP, support is sought primarily for work on the legal, governance and financial issues, for the installation of a project office coordinating and supporting management of CTA-PP as well as the design of CTA and the planning of the implementation, and for studies regarding the optimisation and production of CTA components by industry. The ultimate delivery of CTA-PP will be a detailed implementation plan for the CTA infrastructure.
Dziedzina nauki
- natural sciencesphysical sciencestheoretical physicsparticle physics
- natural sciencesphysical sciencesplasma physics
- natural sciencesphysical sciencesastronomyobservational astronomygamma-ray astronomy
- natural sciencesphysical sciencesastronomyastrophysics
- natural sciencesphysical sciencesastronomyphysical cosmology
Zaproszenie do składania wniosków
FP7-INFRASTRUCTURES-2010-1
Zobacz inne projekty w ramach tego zaproszenia
System finansowania
CP-CSA-Infra-PP - Construction of New Research Infrastructures - Preparatory PhaseKoordynator
80539 Munchen
Niemcy
Zobacz na mapie
Uczestnicy (18)
69117 Heidelberg
Zobacz na mapie
22607 Hamburg
Zobacz na mapie
75794 Paris
Zobacz na mapie
75015 PARIS 15
Zobacz na mapie
08193 Cerdanyola Del Valles
Zobacz na mapie
31007 KRAKOW
Zobacz na mapie
Zakończenie uczestnictwa
LS2 9JT Leeds
Zobacz na mapie
00136 Roma
Zobacz na mapie
35122 Padova
Zobacz na mapie
8006 ZURICH
Zobacz na mapie
6020 Innsbruck
Zobacz na mapie
20014 Turku
Zobacz na mapie
10691 Stockholm
Zobacz na mapie
1429 Buenos Aires
Zobacz na mapie
113 8656 Tokyo
Zobacz na mapie
2531 Potchefstroom
Zobacz na mapie
9000 Windhoek
Zobacz na mapie
LE1 7RH Leicester
Zobacz na mapie