CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Pilot 2 started, including manual for operation and fully completed commissioning (Month 31)
Pilot 1 shippedPilot 1 shipped, including n.28 parabolic solar collectors for a total collecting surface of 2’285 m2 and a fully containerized BOP made of pumps, oil-to-steam heat exchanger, vessel, system control panel, re-usable foundations, re-usable solar field piping (Month 23)
Pilot 1 startedPilot 1 started, including manual for operation and fully completed commissioning (Month 27)
Pilot 2 shippedPilot 2 shipped, including n.12 linear Fresnel collectors for a total collecting surface of 2’670 m2 and a fully containerized BOP made of pumps, oil-to-steam heat exchanger, vessel, system control panel, re-usable foundations, re-usable solar field piping (Month 27)
Dissemination & Communication (D&C) Report, including – for each of the activities included in the D&C Plan - an explicit assessment of the KPIs vs. the planned targets, a description of the lessons learnt during the project and the potential follow-up activities to be implemented after project end (Month 24)
Dissemination & Communication PlanDissemination & Communication (D&C) Plan, including the definition of the specific D&C activities dedicated to each of the target groups (industrial users and EPC partners, financial partners, research institutes, institutional decision makers and the wider audience); Key Performance Indicators (KPIs) targets will be defined for each activity (Month 3)
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available